BAYFRONT TRAIL

AMI designed a new, concrete boardwalk upon an old, wooden dock structure. This project included stormwater design, erosion control, aquatic vegetation, streambank stabilization, shoreline retaining walls, a sliding bridge, and two scenic overlooks. To mitigate for open water losses resulting from the dock wall repairs, AMI collaborated with the MN DNR to design and permit pan fish spawning habitat. This habitat was made by shallowing and installing substrate for the spawning bed. Native yellow and white lilies were integrated to provide fish coverage. Emergent vegetation buffer strips were also installed to treat stormwater runoff.

KEY PERSONNEL

Chad Scott, PE
Principal

Zachary Morris, PE
Coastal Engineer

Chase Dewhirst, PE
Marine Engineer

Jordan Vargas
Environmental Engineer

Previous
Previous

Barkers Island Restoration

Next
Next

Canal Restoration